Below Grade Instalation

Take some time to view our step-by-step animations to see how easy Bigfoot installation is!

STEPS:

  1. Dig hole.
  2. Base should be placed on undisturbed soil or 4" - 6" of compacted crushed stone or gravel.
  3. Excess rings should be cut off at the top of the ring being used and removed.
  4. Screw required length of construction tube to the footing form with four 1" screws.

    step 4 step 5 step 6 step 9

    Step Four

    Step Five

    Step Six

    Step Nine


  5. Install in hole.
  6. Plumb and level. The tube must be braced if it extends 3 ft. or more above grade.
  7. If necessary, have inspected by building inspector before backfilling.
  8. Backfill. Avoid dropping or placing heavy rocks or heavy wet soil on the footing form.
  9. Pour concrete using footing form inverted on top of the construction tube as a funnel.


Print all or part of our Installation manual (PDF files require Adobe Acrobat Reader . Download it now !)

To have a complete set of engineered documentation and instructions mailed or faxed to you, contact us!

From anywhere in North America: TF 1 800 934 0393
From anywhere in the world: (country code 011) 902 627 1600

ALSO: View the above ground installation instructions.