Bigfoot tech info, concrete footing forms above ground site map

World's #1 Selling
Concrete Construction Tube
Footing Form!

Bigfoot footing forms saves time, money & hassle!
Call 1-902-627-1600 or 1-800-934-0393 from Canada

Click & see our Bigfoot video!

Our footing forms' tech info, concrete construction forms above ground - you can count on them!

Bigfoot concrete footing forms - above ground installation
Note: If not backfilled, footing forms must be anchored to the ground

Click to see our step-by-step animations and discover Bigfoot's simple installation!

Here's Bigfoot's 4-step process to above ground install of concrete footers:

footing form install step 1

Step 1

footing form install step 2

Step 2

footing form install step 3

Step 3

footing form install step 4

Step 4

1. Excess rings should be cut off at the top of the ring being used and removed.
2. Screw required length of construction tube to the footing form with four 1" screws.
3. Drill 3/8" (10 mm) holes on a 45 degree angle in the footing form as indicated by the markings on the flange area at each rib location to accept 12" (300 mm) spikes. Drive 12" (300 mm) spikes in at a 45 degree angle to prevent the footing form from rising.
4. Pour concrete using footing form inverted on top of the construction tube as a funnel

Print all or part of our concrete footing forms installation manual (pdf)

Engineered documentation & instructions:

To have a complete set of engineered documentation and instructions mailed or faxed to you, contact us!
Toll free from anywhere in North America: 1-800-934-0393
From anywhere in the world: (country code 011) 902-627-1600

top of page
© 2008 - 2019 bigfoot systems®